Working bee

Our working bee is coming up on the 22nd of February at 10am. Please come along and help to tidy up our school. A list of tasks required are included.

Working Bee

Remove the stump from near the steps in front of the Hall.

Empty Calf shed.

Trim the Wisteria near Cubby.

Remove mulch for 1 metre along the side of the Library and then lay stones in the area.

Clear all plants from the front gate up to the bollards.

Spread stones alongside the office and fix stones on creek bed.

Spread mulch in the outdoor eating area.

Spread mulch below office.

Cut back regrowth on gum tree near garden steps.

Remove flower heads from Agapanthus.

Remove Agapanthus from behind store room.

General weeding.

Tip run.

Green waste run.